Construction of sewage plant of Arenthon
La Roche sur Foron (74) - France
Client
MAURO TP on behalf of the Communauté de Communes du Pays RochoisAssignment
Civil Engineering - Preliminary design of structures - Studies of performance - Plans Plans formwork reinforcement
Description
Construction of a sewage treatment plant Arenthon in order to replace those of Orange and Amancy.
Capacity 90 000 pe, including a large industrial load
The station consists of:
- Building a pretreatment
- a primary clarifier distribution and local technical
- two aeration tanks,
- 2 clarifiers,
- Building a degassing
- a thickener,
- a local pumping
- a digester
- an operations building.